ISRO Chandrayaan 3 status News Today


 



As of my last knowledge update in September 2021, the Chandrayaan-3 mission by the Indian Space Research Organisation (ISRO) was planned as India's third lunar exploration mission. The primary objective of the Chandrayaan-3 mission was to land a rover on the lunar surface and conduct scientific experiments.

 

However, please note that I do not have real-time information, and the status of the mission may have changed since my last update. To get the most up-to-date information on the status of Chandrayaan-3

as per isro website :

Chandrayaan-3Home /Activities/ Future Missions /Chandrayaan-3

LVM3-M4-Chandrayaan-3 Mission:

July 17, 2023

The second orbit-raising maneuver performed. The spacecraft is now in 41603 km x 226 km orbit.

July 15, 2023

The first orbit-raising maneuver (Earthbound firing-1) is successfully performed at ISTRAC/ISRO, Bengaluru. Spacecraft is now in 41762 km x 173 km orbit.

July 14, 2023

LVM3 M4 vehicle successfully launched Chandrayaan-3 into orbit. Chandrayaan-3, in its precise orbit, has begun its journey to the Moon. Health of the Spacecraft is normal.

July 11, 2023

The 'Launch Rehearsal' simulating the entire launch preparation and process lasting 24 hours has been concluded.

July 07, 2023

Vehicle electrical tests completed. Citizens are invited to witness the launch from the Launch View Gallery at SDSC-SHAR, Sriharikota, by registering at here

July 06, 2023

The launch is scheduled for July 14, 2023, at 14:35 Hrs. IST from the Second Launch Pad, SDSC-SHAR, Sriharikota.

 

Chandrayaan-3 consists of an indigenous Lander module (LM), Propulsion module (PM) and a Rover with an objective of developing and demonstrating new technologies required for Inter planetary missions. The Lander will have the capability to soft land at a specified lunar site and deploy the Rover which will carry out in-situ chemical analysis of the lunar surface during the course of its mobility. The Lander and the Rover have scientific payloads to carry out experiments on the lunar surface. The main function of PM is to carry the LM from launch vehicle injection till final lunar 100 km circular polar orbit and separate the LM from PM. Apart from this, the Propulsion Module also has one scientific payload as a value addition which will be operated post separation of Lander Module. The launcher identified for Chandrayaan-3 is LVM3 M4 which will place the integrated module in an Elliptic Parking Orbit (EPO) of size ~170 x 36500 km.

The mission objectives of Chandrayaan-3 are:

  1. To demonstrate Safe and Soft Landing on Lunar Surface
  2. To demonstrate Rover roving on the moon and
  3. To conduct in-situ scientific experiments.

To achieve the mission objectives, several advanced technologies are present in Lander such as,

  1. Altimeters: Laser & RF based Altimeters
  2. Velocimeters: Laser Doppler Velocimeter & Lander Horizontal Velocity Camera
  3. Inertial Measurement: Laser Gyro based Inertial referencing and Accelerometer package
  4. Propulsion System: 800N Throttleable Liquid Engines, 58N attitude thrusters & Throttleable Engine Control Electronics

  5. Navigation, Guidance & Control (NGC): Powered Descent Trajectory design and associate software elements
  6. Hazard Detection and Avoidance: Lander Hazard Detection & Avoidance Camera and Processing Algorithm
  7. Landing Leg Mechanism.

To demonstrate the above said advanced technologies in earth condition, several Lander special tests have been planned and carried out successfully viz.

please Fallow my page, 
Thanks you 

Comments

Popular posts from this blog

HEALTH INSURANCE Buy Online

Fastag How To work

HARINGHATA BLUE DRINKING WATER